VAT is included in the prices shown

Average UK Mainland lead times:

CertaUPS = 1-2 working days (Mon - Fri)
Riello = 1-2 working days (Mon - Fri)
APC = 1-2 working days (Mon - Fri)

Allrack = 1-2 working days (Mon - Fri)

Clarke = 2-3 working days (Mon - Fri)

Tripp Lite = 2-5 working days (Mon - Fri)

PRSi = 4 - 5 working days (Mon - Fri)

Cover = 5-7 working days (Mon - Fri)

CE+T = 4 to 6 weeks (please ask)

80A Wall Mountable 3/3 Phase Bypass

This Bypass would typically be used with a 20kVA - 30kVA size UPS, however please check the Tech Spec below is compatible with your UPS. If in doubt, please contact us.

 

Tech Spec:

Max Panel Current Rating: 80A

Max Cable Size (SWA): 25mm

Input Phasing: 3

Output Phasing: 3

Type of Bypass: Isolator (not breaker)

Interlocking: Mechanical & Aux contacts

Dimensions: 400W x 500H x 200D mm

 

Drawing

Wall Mountable 3/3 80A Bypass RB1-C-EMBS-80A-4P-ISO-344-MECH

SKU: RB1-C-EMBS-80A-4P-ISO-344-MECH
£956.16Price
© Copyright 2020 ESC POWER Limited. All Rights Reserved.
Company No. 11552026   VAT No. GB303806333