VAT is included in the prices shown

Average UK Mainland lead times:

CertaUPS = 1-2 working days (Mon - Fri)
Riello = 1-2 working days (Mon - Fri)
APC = 1-2 working days (Mon - Fri)

Allrack = 1-2 working days (Mon - Fri)

Clarke = 2-3 working days (Mon - Fri)

Tripp Lite = 2-5 working days (Mon - Fri)

PRSi = 4 - 5 working days (Mon - Fri)

Cover = 5-7 working days (Mon - Fri)

CE+T = 4 to 6 weeks (please ask)

UK Power Cable with BS 1363 Plug - C19 to BS 1363, 13A, 250V, 16 AWG, 2.4 m, Black

Tripp Lite UK Power Cable with BS 1363 Plug P052-008

SKU: P052-008
£21.14Price
© Copyright 2021 ESC POWER Limited. All Rights Reserved.
Company No. 11552026   VAT No. GB303806333