CertaUPS C500E-200-65 20kVA / 18kW Tower 65mins | ESC Power

VAT is included in the prices shown

Average UK Mainland lead times:

CertaUPS = 1-2 working days (Mon - Fri)
Riello = 1-2 working days (Mon - Fri)
APC = 1-2 working days (Mon - Fri)

Allrack = 1-2 working days (Mon - Fri)

Clarke = 2-3 working days (Mon - Fri)

Tripp Lite = 2-5 working days (Mon - Fri)

PRSi = 4 - 5 working days (Mon - Fri)

Cover = 5-7 working days (Mon - Fri)

CE+T = 6 weeks

The C500E can be installed with internal batteries as standard, or with the addition of Extended Battery Cabinets. Additional flexibility is achieved for the C500E through its sophisticated design. The selectable input between single phase and three phase allows users to retain electrical infrastructure and save costs where applicable.

 

One additional battery cabinet is included 480W x 845D x 1670H mm - 760KG

 

Key Features:
  • Wide input voltage window
  • Selectable output voltage
  • Frequency converter feature
  • EPO connection
  • Future expansion or redundancy
  • Plug n play parallel kits
  • Internal manual bypass
  • Small footprint
  • 3 phase/1 phase input option as standard on C500E

  •  

Datasheet

Commissioning

SNMP Network Card

Temperature & Humidity Sensor

Relay Card

DB9 Relay Card

R485 Modbus Card

 

All battery loads have been sized at 0.7 Power Factor Full Load. Technical specifications and autonomies can not be taken as definitive and are subject to change without notice.     

CertaUPS C500E-200-65 20kVA / 18kW Tower 65mins

SKU: C500E-200-65
£9,818.73Price
© Copyright 2020 ESC POWER Limited. All Rights Reserved.
Company No. 11552026   VAT No. GB303806333