Allrack 6 Way UK Vertical PDU With UK Lead PDU6HV | ESC Power

VAT is included in the prices shown

Average UK Mainland lead times:

CertaUPS = 1-2 working days (Mon - Fri)
Riello = 1-2 working days (Mon - Fri)
APC = 1-2 working days (Mon - Fri)

Allrack = 1-2 working days (Mon - Fri)

Clarke = 2-3 working days (Mon - Fri)

Tripp Lite = 2-5 working days (Mon - Fri)

PRSi = 4 - 5 working days (Mon - Fri)

Cover = 5-7 working days (Mon - Fri)

CE+T = 6 weeks

*Please note image may not be an exact representation of the number of actual power output sockets (please use the description).

 

Allrack 6 Way UK Vertical PDU  With UK Lead PDU6HV

 

Allrack 6 Way UK Vertical PDU With UK Lead PDU6HV

SKU: PDU6HV
£20.15Price
© Copyright 2020 ESC POWER Limited. All Rights Reserved.
Company No. 11552026   VAT No. GB303806333