Allrack 20 Way UK Vertical PDU With UK Lead PDU20HV | ESC Power

     Coronavirus:   Most product deliveries are currently not affected or are experiencing only minor delays. If in doubt please check with us. Keep safe & well.     

Average UK Mainland lead times:

CertaUPS = 1-2 working days (Mon - Fri)
Riello = 1-2 working days (Mon - Fri)
APC = 1-2 working days (Mon - Fri)

Allrack = 1-2 working days (Mon - Fri)

Clarke = 2-3 working days (Mon - Fri)

Tripp Lite = 2-5 working days (Mon - Fri)

PRSi = 4 - 5 working days (Mon - Fri)

Cover = 5-7 working days (Mon - Fri)

CE+T = 3-4 weeks 

*Please note image may not be an exact representation of the number of actual power output sockets (please use the description).

 

Allrack 20 Way UK Vertical PDU With UK Lead PDU20HV.

 

Allrack 20 Way UK Vertical PDU With UK Lead PDU20HV

SKU: PDU20HV
£57.59Price
  • VAT is included in the prices shown.

© Copyright 2020 ESC POWER Limited. All Rights Reserved.
Company No. 11552026   VAT No. GB303806333